
Dew Gathering System
Overview
The 323-mile Dew gathering system is located in Anderson, Freestone, Leon and Robertson Counties of East Texas. The system provides gathering, dehydration and compression services and ultimately delivers into the Pinnacle gas treating system for any required treating. The Dew gathering system has 9 compressor stations with a combined 36,480 horsepower of compression. Anadarko is the only shipper on the Dew gathering system.
Operating Data
Pinnacle Gas Treating, LLC (WES) |
Tejas Pipeline (Kinder Morgan ) |
Pinnacle Gas Treating, LLC
Pinnacle Gas Treating, LLC
Overview
The Pinnacle gathering system includes our 267 mile Pinnacle gathering system and our Bethel treating plant. The Pinnacle system provides sour gas gathering and treating service in Anderson, Freestone, Leon, Limestone and Robertson Counties of East Texas. The Bethel treating plant, located in Anderson County, has total CO2 treating capacity of 502 MMcf/d and 20 LTD of sulfur treating capacity.
The Pinnacle gathering system is well-positioned to provide gathering and treating services to the five-country area over which it extends, including the Cotton Valley Lime formations, which contain relatively high concentrations of sulfur and CO2. Anadarko is the largest shipper on the Pinnacle gathering system with approximately 91% of system throughput for the 9 months ended September 30, 2012. The remaining throughput on the system during 2012 was from four third-party shippers.
Operating Data
ATMOS Pipeline - Texas |
Enbridge Pipelines (East Texas), LP |
Energy Transfer Fuel Pipeline |
Enterprise Texas Pipeline, LP |
ETC Texas Pipeline (Energy Transfer) |
Tejas Pipeline (Kinder Morgan) |
| 2012 Average Volume |
134 MMcf/d |
| Gathering Lines (3" to 24") |
267 Miles |
| Receipt Points |
110 |
| Gas Compression (Horsepower) |
1,340 |
| Compressor Station |
1 |
Treating Capacity CO2 Sulfur |
502 MMcf/d 20 LTD |